Stage 1. Installing 23000L sewage Pump out Holding tanks for a proposed Public Amenities at Westshore Beach on the Hawke’s Bay Coast.

Covering Health and Safety by testing the reach of the crane at EMS yard
Arriving at site early to confirm correct location
Having to get the big guns into lift tanks
Unstable free running shingle no problem for EMS team
18000L plus 6000L tanks installed and site left safe and ready for stage two